[1]
Bawana, M.S., Putra, I.N.D.P. and Widowati, E.D. 2025. FEASIBILITY EVALUATION OF THE RELATIONSHIP BETWEEN BCWS, BCWP AND ACWP IN ROAD CONSTRUCTION PROJECT. Multidiciplinary Output Research For Actual and International Issue (MORFAI). 5, 3 (May 2025), 1471–1479. DOI:https://doi.org/10.54443/morfai.v5i3.2991.