RISK MANAGEMENT ANALYSIS RELATED TO THE ROLE OF INDEPENDENT QUALITY CONTROL CONSULTANTS (PMI) IN THE TRANSITION OF FUNDING FROM TOLL ROAD BUSINESS ENTITIES (BUJT) TO THE STATE BUDGET (APBN) IN TOLL ROAD INFRASTRUCTURE PROJECTS USING THE SEM-PLS AND ANALYTICAL HIERARCHY PROCESS METHODS
Published:
2026-02-28Downloads
Abstract
This study analyzes risk management related to the role of Independent Quality Control Consultants during the transition of toll road infrastructure project funding from Toll Road Business Entities (BUJT) to the State Budget (APBN). The funding transition introduces complex regulatory, technical, and coordination challenges that may affect project quality, time performance, and compliance. Therefore, this research aims to examine the influence of competence and risk assessment on the effectiveness of PMI performance, with stakeholder management positioned as an intervening variable. A mixed analytical approach was employed using Structural Equation Modeling–Partial Least Squares (SEM-PLS) and the Analytical Hierarchy Process (AHP). SEM-PLS was applied to test causal relationships among variables, while AHP was used to determine the priority level of factors influencing PMI effectiveness. Data were collected from professionals involved in toll road infrastructure projects, including consultants, contractors, supervisors, and academics. The results show that competence and risk assessment have a significant positive effect on the effectiveness of PMI performance. Furthermore, stakeholder management significantly mediates the relationship between competence and performance, as well as between risk assessment and performance, indicating that effective communication, coordination, and collaboration enhance the impact of technical capabilities and risk control. The AHP analysis reveals that the implementation of government regulatory standards is the most influential factor, followed by professional independence, ethical integrity, and human resource competence in understanding public funding regulations. In conclusion, the effectiveness of PMI during the BUJT-to-APBN funding transition depends on an integrated approach that combines regulatory compliance, professional competence, structured risk assessment, and stakeholder management. These findings provide strategic insights for policymakers and practitioners in strengthening quality control systems within toll road infrastructure projects.
Keywords:
Risk Management Independent Quality Control Consultant (PMI) Funding Transition (BUJT–APBN) Toll Road Infrastructure Projects Stakeholder Management SEM-PLS Analytical Hierarchy Process (AHP)References
Alaghbari, W., Razali A. Kadir, Mohd., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206. https://doi.org/10.1108/09699980710731308
Aninditya, B., Dinariana, D., & Suryani, F. (2023). Implementation of the Hazard Identification, Risk Assessment and Risk Control (HIRARC) Method on Erection Girder Work of South Japek II Toll Road Construction Project Package 3. Interdiciplinary Journal and Hummanity (INJURITY), 2(9), 824–835. https://doi.org/10.58631/injurity.v2i9.127
Bazaluk, O., Petlovanyi, M., Sai, K., Chebanov, M., & Lozynskyi, V. (2024). Comprehensive assessment of the earth’s surface state disturbed by mining and ways to improve the situation: Case study of Kryvyi Rih Iron-ore Basin, Ukraine. Frontiers in Environmental Science, 12. https://doi.org/10.3389/fenvs.2024.1480344
Bhatt, S., Malek, M., & Juremalani, J. (2025). Navigating the road to success: Unravelling the key factors influencing PPP selection in Indian road projects. International Journal of Indian Culture and Business Management, 34(3), 345–364. https://doi.org/10.1504/IJICBM.2025.144904
Canton, H. (2021). United Nations Industrial Development Organization—UNIDO. In The Europa Directory of International Organizations 2021 (23rd edn). Routledge.
Carlsson, L., & Sandström, A. (2008). Network governance of the commons. International Journal of the Commons, 2(1), 33–54.
Cheng, E. W. L., & Li, H. (2002). Construction Partnering Process and Associated Critical Success Factors: Quantitative Investigation. Journal of Management in Engineering, 18(4), 194–202. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:4(194)
Freeman, R. E. (2010). Strategic management: A stakeholder approach. Cambridge university press. https://books.google.com/books?hl=id&lr=&id=NpmA_qEiOpkC&oi=fnd&pg=PR5&dq=Freeman+(1984),+in+Strategic+Management:+A+Stakeholder+Approach,+&ots=62hnL6L8UN&sig=By4rBGz9MPKz08cnfd89nhUXtfw
Ghozali, I., & Latan, H. (2015). Konsep, teknik, aplikasi menggunakan Smart PLS 3.0 untuk penelitian empiris. BP Undip. Semarang, 290.
Hair, J., & Alamer, A. (2022). Partial Least Squares Structural Equation Modeling (PLS-SEM) in second language and education research: Guidelines using an applied example. Research Methods in Applied Linguistics, 1(3), 100027. https://doi.org/10.1016/j.rmal.2022.100027
Hartono, W., Handayani, D., Prabowo, R. A., Dewa, Y. K., & Rohadi, S. (2018). Analysis of girder PCU subcontractor selection method with analytical network process (ANP)(Case study: Musi IV bridge project). The 1st International Conference on Computer Science and Engineering Technology. https://www.researchgate.net/profile/Widi-Hartono/publication/330788022_Analysis_of_Girder_PCU_Subcontractor_Selection_Method_with_Analytical_Network_Process_ANP_Case_Study_Musi_IV_Bridge_Project/links/636d9ab754eb5f547cc14861/Analysis-of-Girder-PCU-Subcontractor-Selection-Method-with-Analytical-Network-Process-ANP-Case-Study-Musi-IV-Bridge-Project.pdf
Haryono, C. G. (2020). Ragam Metode Penelitian Kualitatif Komunikasi. CV Jejak (Jejak Publisher).
Henseler, J., Ringle, C. M., & Sarstedt, M. (2012). Chapter 12: Using Partial Least Squares Path Modeling in Advertising Research: Basic Concepts and Recent Issues. https://www.elgaronline.com/edcollchap/edcoll/9781848448582/9781848448582.00023.xml
Johnson, L., & Schaffer, D. (1994). Oak Ridge National Laboratory: The First Fifty Years. Univ. of Tennessee Press.
McClelland, D. C. (1973). Testing for competence rather than for ‘intelligence.’ American Psychologist, 28(1), 1–14. https://doi.org/10.1037/h0034092
McClelland, D. C., & Boyatzis, R. E. (1982). Leadership motive pattern and long-term success in management. Journal of Applied Psychology, 67(6), 737.
Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of who and What Really Counts. Academy of Management Review, 22(4), 853–886. https://doi.org/10.5465/amr.1997.9711022105
Oktalia, H. J., Mulyani, W. P., & Pitoyo, A. J. (2025). Determinan Ketahanan Pangan Rumah Tangga di Indonesia:Suatu Pendekatan Multilevel (Determinants of Household Food Security in Indonesia:A Multilevel Approach). JURNAL PANGAN, 34(2), 151–168. https://doi.org/10.33964/jp.v34i2.879
Papamichael, M., Dimopoulos, C., & Boustras, G. (2024). Performing risk assessment for critical infrastructure protection: An investigation of transnational challenges and human decision-making considerations. Sustainable and Resilient Infrastructure, 9(4), 367–385. https://doi.org/10.1080/23789689.2024.2340368
Phillips, R. (2003). Stakeholder Theory and Organizational Ethics. Berrett-Koehler Publishers.
Putri, E. S., & Wisudanto, W. (2017). Struktur pembiayaan pembangunan infrastruktur di indonesia penunjang pertumbuhan ekonomi. IPTEK Journal of Proceedings Series, 3(5).
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98. https://doi.org/10.1504/IJSSCI.2008.017590
Sarstedt, M., Ringle, C. M., Cheah, J.-H., Ting, H., Moisescu, O. I., & Radomir, L. (2020). Structural model robustness checks in PLS-SEM. Tourism Economics, 26(4), 531–554. https://doi.org/10.1177/1354816618823921
Savage, G. T., Nix, T. W., Whitehead, C. J., & Blair, J. D. (1991). Strategies for assessing and managing organizational stakeholders. Academy of Management Perspectives, 5(2), 61–75. https://doi.org/10.5465/ame.1991.4274682
Smeeth, L., Douglas, I., Hall, A. J., Hubbard, R., & Evans, S. (2009). Effect of statins on a wide range of health outcomes: A cohort study validated by comparison with randomized trials. British Journal of Clinical Pharmacology, 67(1), 99–109. https://doi.org/10.1111/j.1365-2125.2008.03308.x
Spencer, L. M., & Spencer, P. S. M. (2008). Competence at Work models for superior performance. John Wiley & Sons.
Suhendra, M. (2017). Penyediaan Infrastruktur dengan Skema Kerjasama Pemerintah dan Badan Usaha (Public-Private Partnership) di Indonesia. Jurnal Manajemen Keuangan Publik, 1(1), 41–46.
Wibisono, D. W., Prihatni, R., & Perdana, P. N. (2024). Analisis Kesehatan Kinerja Realisasi APBDesa di Wilayah Kapanewon Karangmojo Kabupaten Gunung Kidul Tahun 2018-2022. Jurnal Akuntansi, Perpajakan Dan Auditing, 5(1), 99–112. https://doi.org/10.21009/japa.0501.07
License
Copyright (c) 2026 Muhammad Rifki Rahman, Erry Rimawan, Mawardi Amin

This work is licensed under a Creative Commons Attribution 4.0 International License.




