ANALYSIS OF PROJECT DELAYS FROM A HUMAN RESOURCE MANAGEMENT PERSPECTIVE USING FAULT TREE ANALYSIS (FTA) IN A HOSPITAL CONSTRUCTION PROJECT
Published:
2026-02-28Downloads
Abstract
Project delays remain a critical issue in construction projects, particularly in hospital developments that involve high complexity, strict functional requirements, and intensive coordination among multidisciplinary teams. Empirical evidence indicates that many delays are not solely caused by technical or material factors, but are strongly associated with deficiencies in human resource management (HRM). This study addresses the question of how human resource–related factors structurally contribute to project delays and what root causes dominate these delays in hospital construction projects. To answer this question, the research applies Fault Tree Analysis (FTA) as the primary analytical method, using a deductive and top–down approach to decompose the main delay event into intermediate and basic events related to HRM practices. A case study was conducted on a hospital construction project in Jakarta that experienced significant schedule deviation. Data were collected through questionnaires, interviews with project personnel, and project documentation, and subsequently modeled into a fault tree structure using logical AND and OR relationships. The results indicate that ineffective workforce planning and weak coordination and communication systems constitute the most critical root causes of project delays. These factors trigger cascading effects such as work interruptions, rework, low labor productivity, and delayed decision-making, which collectively lead to schedule overruns. This study contributes academically by demonstrating the applicability of FTA as a structured root-cause analysis tool for project delays from a human resource management perspective, thereby extending delay analysis literature beyond conventional technical and descriptive approaches, particularly in the context of hospital construction projects.
Keywords:
Project Delay Fault Tree Analysis (FTA) Human Resource Management Root Cause Analysis Hospital Construction ProjectReferences
Abbasi, Omid, Ehsan Noorzai, Kourosh Gharouni Jafari, and Mehrdad Golabchi. “Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran.” Journal of Architectural Engineering 26, no. 3 (2020). https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431.
Banobi, Eric T., and Wooyoung Jung. “Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects.” Sustainability 11, no. 21 (2019). https://doi.org/10.3390/su11215973.
Cahyani, H. Crisia, Hardi Purba, and Budi Susetyo. “Analysis of Occupational Health and Safety Risk Factors and Human Resource Quality on the Implementation of Building Construction Using Fault Tree Analysis.” Journal of Engineering and Technological Sciences (2021).
Isradi, M., and M. Redwan. “Analysis of Work Implementation Related to the Quality Management System on the Light Rail Transit (LRT) Phase 1B Project.” International Journal of Engineering and Advanced Technology (2022).
Kermanshachi, Saman, and Anusha Pamidimukkala. “Uncertainty Analysis of Key Schedule Performance Indicators in Design, Procurement, and Construction Phases of Heavy Industrial Projects.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15, no. 1 (2023). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000588.
Mehrjerdi, Yaser Zare, and Ali Hajimoradi. “A Hybrid FMEA–SD Approach for Behavioral Analysis of Factors Affecting Safety Management and Incidents in the Pelletizing Industry.” Journal of Quality Engineering and Production Optimization (2021). https://doi.org/10.22070/JQEPO.2021.5273.1141.
Nova Aryani, and M. Isradi. “Risk Analysis of Construction Project Delays Using Fault Tree Analysis Approach.” Journal of Civil Engineering and Planning 24, no. 2 (2022): 101–110.
Putra, F. R. A., and Diah Widyaningrum. “Project Delay Factor Analysis Using Fault Tree Analysis (FTA) Method and Rescheduling with Critical Path Method (CPM) in Ducting Manufacturing Projects.” Advance Sustainable Science, Engineering and Technology 6, no. 2 (2024). https://doi.org/10.26877/asset.v6i2.18636.
Sepasgozar, Samad M. E., Reza Karimi, Sara Shirowzhan, Mehrdad Mojtahedi, Shahab Ebrahimzadeh, and Damian McCarthy. “Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK.” Buildings 9, no. 9 (2019). https://doi.org/10.3390/buildings9090191.
Ullah, Ehsan, M. M. Baig, Hamid GholamHosseini, and Jianhua Lu. “Failure Mode and Effect Analysis (FMEA) to Identify and Mitigate Failures in a Hospital Rapid Response System.” Heliyon 8, no. 2 (2022). https://doi.org/10.1016/j.heliyon.2022.e08944.
License
Copyright (c) 2026 Safira Farras Pramesti, Muhammad Isradi

This work is licensed under a Creative Commons Attribution 4.0 International License.