STAFFING GAP ANALYSIS FOR CONCRETE PUMP TECHNICIANS: A WLA AND FTE APPROACH IN THE HEAVY EQUIPMENT RENTAL INDUSTRY
Published:
2026-06-02Downloads
Abstract
Ensuring operational efficiency in the heavy equipment rental business requires a precise alignment between equipment availability and workforce capacity, particularly for concrete pump technicians operating across demanding project sites. This study addresses the empirical gap in technician staffing adequacy by applying Workload Analysis (WLA) and Full-Time Equivalent (FTE) within a heavy equipment rental company. Activity data from five technicians were collected through structured interviews and verified through layered validation involving HRD judgment, managerial review, and company work reports. The analysis produced a total annual workload of 6,221.25 hours, equivalent to 3.31 FTE, quantifying an overstaffing condition in which individual FTE values ranged from 0.60 to 0.71, all classified as underload. Scenario analysis further demonstrated that a staffing level of three technicians yields an FTE of 1.10, the only configuration falling within the normal workload range. These findings extend the application of WLA and FTE to concrete pump maintenance in heavy equipment rental, a context that remains limited in prior workforce planning literature, and demonstrate the value of multi-layered data validation in improving the accuracy of workforce requirement assessments.
Keywords:
Workload Analysis Full-Time Equivalent Workforce Planning Concrete Pump Technicians Heavy Equipment RentalReferences
Ahmad, A., Herdianzah, Y., Safutra, N. I., Rauf, N., Gamgulu, R., & Nur, T. (2023). Workload analysis to determine the optimal number of workforce using the Work Load Analysis (WLA) method at PT. Harapan Jaya Multi Bisnis. OPSI, 16(2), 241–249. https://doi.org/10.31315/opsi.v16i2.8967
Akl, A. M., El Sawah, S., Chakrabortty, R. K., & Turan, H. H. (2022). A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach. Reliability Engineering & System Safety, 219, Article 108175. https://doi.org/10.1016/j.ress.2021.108175
Akl, A. M., Rahman, H. F., Chakrabortty, R. K., & Sawah, S. El. (2024). An assets maintenance-workforce planning problem under uncertainty: A chance constraints assisted simulation-optimization approach. Simulation Modelling Practice and Theory , 130, Article 102839. https://doi.org/10.1016/j.simpat.2023.102839
Asres, G. D., & Gessesse, Y. K. (2024). Workload Indicators of Staffing Need (WISN) method for health workforce planning at health facility: A scoping review. Human Factors in Healthcare, 6, 100078. https://doi.org/10.1016/j.hfh.2024.100078
Deepak, D., Brar, G., Dwivedi, S., Farwaha, H., Alkhaleel, B., & Pandey, S. (2025). Optimizing concrete pump maintenance in the construction sector using enhanced MCDM techniques. Scientific Reports, 15, Article 13816. https://doi.org/10.1038/s41598-025-98481-3
Girasek, E., Kovács, E., Aszalós, Z., Eke, E., Ragány, K., Kovács, R., Cserháti, Z., & Szócska, M. (2016). Headcount and FTE data in the European health workforce monitoring and planning process. Human Resources for Health, 14(1), 42. https://doi.org/10.1186/s12960-016-0139-2
Golbasi, O., & Sahiner, S. F. (2024). Simulation-based optimization of workforce configuration for multi-division maintenance departments. Computers & Industrial Engineering, 188, 109880. https://doi.org/10.1016/j.cie.2024.109880
Gurcanli, G. E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182, 265–273. https://doi.org/10.1016/j.proeng.2017.03.189
Hallowell, M. R., & Gambatese, J. A. (2010). Qualitative Research: Application of the Delphi Method to CEM Research. Journal of Construction Engineering and Management, 136(1), 99–107. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000137
Hardiansyah, H., Suliawati, S., & Sibuea, S. R. (2022). Analisis Beban Kerja dengan Pendekatan Metode Full Time Equivalent (FTE) pada Pembuatan Meja Belajar di CV Setia Abadi. Factory Jurnal Industri, Manajemen Dan Rekayasa Sistem Industri, 1(2), 67–73. https://doi.org/10.56211/factory.v1i2.194
Hudaningsih, N., & Prayoga, R. (2019). Analisis Kebutuhan Karyawan Dengan Menggunakan Metode Full TIME Equivalent (FTE) Pada Departemen Produksi PT. Borsya Cipta Communica. Jurnal Tambora, 3(2), 98–106. https://doi.org/10.36761/jt.v3i2.278
Khotimah, K., & Jufriyanto, Moh. (2025). Analisis Beban Kerja Karyawan Untuk Menentukan Jumlah Pekerja Yang Optimal Menggunakan Metode Workload Analysis (WLA) Dan Full Time Equivalent (FTE). INTECOMS: Journal of Information Technology and Computer Science, 8(5), 1534–1540. https://doi.org/10.31539/bff2p111
Mahmudi, S. F. I., Budiharti, N., & Priyasmanu, T. (2020). Analisa Beban Kerja Dan Penentuan Tenaga Kerja Optimal Dengan Metode Workload Analysis (WLA) Di PT. Bintang Mas Glassolutions, Bedali, Lawang, Malang Jawa Timur-Indonesia. Jurnal Valtech, 3(2), 166–170. https://doi.org/10.36040/valtech.v3i2.2746
Pangestu, A. H., Setiyawan, A., Alfiansyah, T., Sutiawan, H., Fauzi, D. A., & Sianturi, N. D. S. (2024). Analisis Beban Kerja Dokter di Klinik Pratama Ubhara Jaya dengan Metode Full Time Equivalent. Lokawati : Jurnal Penelitian Manajemen Dan Inovasi Riset, 2(4), 63–75. https://doi.org/10.61132/lokawati.v2i4.966
Rachmuddin, Y., Dewi, D. S., & Dewi, R. S. (2021). Workload analysis for laboratory and sample house employees in mining industry using full-time equivalent. Proceedings of the International Conference on Industrial Engineering and Operations Management, 1979–1984.
Ruppert, T., Scheffer, S., Ansari, F., & Macchi, M. (2025). Resilient Maintenance Operator: Technology and Skills for Evolution. IFAC-PapersOnLine, 59(24), 215–220. https://doi.org/10.1016/j.ifacol.2025.11.867
Sari, A. D., Hardiansa, F., & Suryoputro, M. R. (2018). Workload assessment on foundry SME to enhance productivity using full time equivalent. MATEC Web of Conferences, 154, Article 01081. https://doi.org/10.1051/matecconf/201815401081
Sekarjati, K. A., Wibowo, A. H., & Prasetiyo, A. B. (2024). Evaluation of operator performance in the service industry to improve company productivity. AIP Conference Proceedings, 2952(1), Article 120006. https://doi.org/10.1063/5.0211991
Sunarya, P. A., Andriyani, F., henderi, & Rahardja, U. (2019). Algorithm Automatic Full Time Equivalent, Case study of health service. International Journal of Advanced Trends in Computer Science and Engineering, 8(1.5), 387–391. https://doi.org/10.30534/ijatcse/2019/6281.52019
Suryadi, A., Winursito, Y. C., Pradanarka, A. M., Rakhmanhuda, I., & Kirana, I. W. (2025). Workload analysis using the full time equivalent (FTE) and nasa-tlx methods to improve employee performance at company x. IOP Conference Series: Earth and Environmental Science, 1454(1), Article 012040. https://doi.org/10.1088/1755-1315/1454/1/012040
Tretten, P., Lööw, J., & Ilankoon, P. (2025). Challenges and strategies associated with recruiting, training, and retaining mining maintenance workers. Creativity, Innovation and Entrepreneurship, 166, 34–40. https://doi.org/10.54941/ahfe1006108
Wahyuni, N., Gunawan, A., Ferdinant, P. F., & Fitriyanti, E. (2019). Designing employee workload calculation based on Java-based full time equivalent method. IOP Conference Series: Materials Science and Engineering, 673(1), Article 012098. https://doi.org/10.1088/1757-899X/673/1/012098
Widhiarso, W., Zein, N. F. R., & Jatiningsih, M. G. D. (2022). Analisis Beban Kerja Menggunakan Metode Workload Analysis (WLA) Untuk Menentukan Kebutuhan Tenaga Kerja Optimal. Jurnal Teknik Industri, 1(2), 70–80. https://doi.org/10.30659/jurti.1.2.70-80
Yasmin, Z., & Ariyanti, S. (2019). Analisis Beban Kerja Pada Maintenance BD-Check Dengan Metode Full Time Equivalent. Jurnal Ilmiah Teknik Industri, 6. https://doi.org/10.24912/jitiuntar.v6i1.3024
Yudhistira, G. A., Basumerda, C., & Qurtubi. (2023). Workload analysis for administrative workers by using full-time equivalent. In I. A. Samad & Akhyar (Eds.), Preface: 11th Annual International Conference (AIC) 2021 (Vol. 2613, p. Article 020010). AIP Conference Proceedings. https://doi.org/10.1063/5.0119346
License
Copyright (c) 2026 Muhammad Nursyamsu Alhafidh, Anik Dwiastuti, Rudi Nurdiansyah

This work is licensed under a Creative Commons Attribution 4.0 International License.




