ACCURACY ASSESSMENT OF BIM-BASED AUTODESK REVIT FOR CONCRETE AND REINFORCEMENT QUANTITY TAKE-OFF IN BRIDGE STRUCTURES

Authors

Muhamad Aidil Fikri , Gunawan , Roma Dearni

DOI:

10.5281/zenodo.20772573

Published:

2026-06-20

Downloads

Abstract

The development of Building Information Modeling (BIM) technology has accelerated digital transformation in the construction industry, particularly in improving the efficiency and accuracy of quantity estimation processes. However, Quantity Take-Off (QTO) calculations for bridge structures are still commonly performed using conventional methods, which are susceptible to human error and require considerable time. This study aims to evaluate the accuracy of BIM-based Autodesk Revit in estimating concrete and reinforcement quantities by comparing its results with conventional calculations on the Station VII B Bridge Project in Dumai City. A quantitative comparative approach was employed through three-dimensional modeling using Autodesk Revit 2024 and conventional quantity calculations based on Detailed Engineering Design (DED) documents. The resulting quantities were analyzed using Average Error and Root Mean Square Error (RMSE) to assess the level of agreement between the two methods. The results indicate that concrete quantity estimation recorded an Average Error of 1.455% with an RMSE value of 0.712 m³, while reinforcement quantity estimation showed an Average Error of 1.765% and an RMSE value of 0.016 m³. These findings demonstrate that Autodesk Revit is capable of producing quantity estimates that are highly consistent with conventional calculations while providing greater efficiency and reducing the potential for manual calculation errors. Therefore, Autodesk Revit can be considered a reliable alternative for Quantity Take-Off applications in bridge construction projects.

Keywords:

Building Information Modeling (BIM) Autodesk Revit Quantity Take-Off Bridge Structure Reinforcement

References

Adji, F. F., & Fransisco, T. (2025). Pengaruh BIM dalam Percepatan Proyek Konstruksi. II(01), 16–21.

Fadillah, M., & Nofriadi. (2022). QUANTITY TAKE-OFF PEKERJAAN STRUKTUR BERBASIS BUILDING INFORMATION MODELING (BIM) PEMBANGUNAN GEDUNG KANTOR PELAYANAN PAJAK PRATAMA BALIGE. 2(1).

Faozan, A. (2025). PERBANDINGAN QUANTITY TAKE-OFF(QTO) PADA GELAGAR BETON PRATEKAN KOTAK BETON DAN TULANGAN ANTARA METODE BUILDING INFORMATION MODELLING (BIM) DENGAN METODE KONVENSIONAL.

Gabriel, J., Sianturi, A., Cynthia, G., Hasibuan, R., Jaya, I., Dewi, R. A., Geby, G., & Syafridon, A. (2025). A Comparative Analysis of Quantity Take-Off Processes in Construction Projects Using Graphisoft Archicad and Autodesk Revit. 01(1), 20–27.

Johari, G. J., & Hakim, L. L. (2026). Pengaruh Implementasi Revit-BIM terhadap Akurasi Quantity Take-Off Struktur Pada Proyek Bangunan Komersial. 2022, 852–862. https://doi.org/10.33364/konstruksi/v.24-1.2809

Kusuma, I., & Enda, D. (2026). COMPONENT-LEVEL ANALYSIS OF QUANTITY TAKE-OFF DEVIATIONS BETWEEN BIM AND CONVENTIONAL METHODS IN REINFORCED. 4(4), 6072–6082.

Kusumaningroem, T. T., & Gondokusumo, O. (2023). Comparison of Building Information Modeling and Conventional Methods for Concrete and Rebar Quantity Take-Off. 1(2), 674–684.

Novita, Rizki Dwi Pangestuti, E. K. (2021). ANALISA QUANTITY TAKE OFF DAN RENCANA ANGGARAN BIAYA DENGAN METODE BUILDING INFORMATION MODELING ( BIM ) MENGGUNAKAN S OFTWARE AUTODEKS REVIT 2019 ( Studi Kasus : GEDUNG LP3 UNIVERSITAS NEGERI SEMARANG ) QUANTITY TAKE OFF ANALYS. 14(1), 27–31.

Sadad, I., Jaya, F. H., & Januar, I. W. (2022). Implementasi BIM take off quantity material struktur abutment jembatan terhadap volume rencana. Jurnal Teknika Sains, 07(02), 91–97.

Saputra, H., Pratama, R., Tita, E. E., & Yusa, M. (2024). Comparative Analysis of Quantity Take-Off Material Between Conventional Method & BIM Nemetschek Allplan Method on Bridge. 12(4), 2622–2633. https://doi.org/10.13189/cea.2024.120410

Simatupang, F. J., Hasibuan, G. C. R., Jaya, I., Dewi, R. A., Geby, G., & Syafridon, A. (2024). International Journal of Architecture and Urbanism Quantity Take Off Comparison Using Building Information Modelling ( BIM ) with Autodesk Revit Software and Traditional Method. 08(02), 184–190.

Stefanus Lutfiansyah, Y. (2025). Analisis Perbandingan Perhitungan Quantity Take-Off Metode Konvensional dengan Perhitungan Berbasis BIM Pada Pekerjaan Struktur Beton Jembatan. Jurnal Teknik Sipil, 21, 249–258. https://doi.org/10.28932/jts.v21i2.8560

Taghaddos, H., Mashayekhi, A., & Sherafat, B. (2024). Automation of Construction Quantity Take-off in a BIM Model.

Tigauw, F., Aprilianto, F., & Santoso, H. T. (2023). ANALISA PERHITUNGAN QUANTITY MATERIAL TAKE-OFF ( QMTO ) STRUKTUR BAWAH JEMBATAN TIPE SKEW DENGAN MENGGUNAKAN BIM AUTODESK REVIT Calculation Analysis of Quantity Material Take-Off ( QMTO ) of A Skewed Bridge Substructure Using BIM Autodesk Revit. 2, 58–65.

Author Biographies

Muhamad Aidil Fikri, Politeknik Negeri Bengkalis

Author Origin : Indonesia

Gunawan, Politeknik Negeri Bengkalis,

Author Origin : Indonesia

Roma Dearni, Politeknik Negeri Bengkalis

Author Origin : Indonesia

Downloads

Download data is not yet available.

How to Cite

Fikri, M. A., Gunawan, & Roma Dearni. (2026). ACCURACY ASSESSMENT OF BIM-BASED AUTODESK REVIT FOR CONCRETE AND REINFORCEMENT QUANTITY TAKE-OFF IN BRIDGE STRUCTURES. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(4), 6326–6333. https://doi.org/10.5281/zenodo.20772573

Similar Articles

<< < 27 28 29 30 31 32 33 34 35 36 > >> 

You may also start an advanced similarity search for this article.