BIM-BASED STEEL QUANTITY TAKE-OFF EVALUATION FOR STEEL FRAME BRIDGES: A COMPARISON BETWEEN AUTODESK REVIT AND CONVENTIONAL CALCULATIONS
DOI:
10.5281/zenodo.21485754Published:
2026-07-20Downloads
Abstract
Building Information Modeling (BIM) has become an effective approach for improving the efficiency and accuracy of quantity take-off (QTO) in construction projects, including steel truss bridges. This study evaluates the accuracy of steel weight quantity take-off generated using Autodesk Revit 2025 by comparing it with conventional calculations based on the Detail Engineering Design (DED). The comparison was conducted on 34 steel profile groups consisting of 210 structural members. Steel weight obtained from Autodesk Revit was compared with conventional calculations using percentage difference and statistical indicators, including Mean Error (ME), Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and the Coefficient of Determination (R²). The results show that Autodesk Revit produced a total steel weight of 27,526.57 kg, while the conventional calculation yielded 27,478.92 kg, resulting in a percentage difference of only 0.17%. The statistical evaluation produced an ME of 1.40 kg, an MAE of 9.31 kg, a MAPE of 1.89%, and an R² value of 0.9996, indicating excellent agreement between the two methods. Unlike previous studies that mainly compared total quantities, this study evaluates steel weight quantity take-off at the individual profile level, providing a more detailed assessment of Autodesk Revit accuracy for steel truss bridge structures. The findings demonstrate that Autodesk Revit 2025 is a reliable and effective tool for BIM-based steel quantity take-off.
Keywords:
Autodesk Revit 2025 Building Information Modeling (BIM) Quantity Take-Off Steel Truss Bridge Structural FramingReferences
Abma, V., Sulistyantoro, T. N., & Nugraheni, F. (2026). Exploration of BIM Automatic Quantity Take Off for Contractor on Bridge Structural Model. G-Tech: Jurnal Teknologi Terapan, 10(1), 179–189. https://doi.org/10.70609/G-TECH.V10I1.8735
Dwi Nur Wahyudi, & Masca Indra Triana. (2025). Implementasi BIM dengan Autodesk Revit 2025 pada quantity take-off material struktur Gedung Plaza Airlangga (Unair) tahap 1 terhadap volume. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 14(1), 142–151. https://doi.org/10.22225/PD.14.1.12449.142-151
Saputra, H., Pratama, R., Tita, E. E., & Yusa, M. (2024). Comparative Analysis of Quantity Take-Off Material Between Conventional Method & BIM Nemetschek Allplan Method on Bridge. Civil Engineering and Architecture, 12(4), 2622–2633. https://doi.org/10.13189/CEA.2024.120410
Stefanus, S., & Lutfiansyah, Y. (2025). Analisis Perbandingan Perhitungan Quantity Take-Off Metode Konvensional dengan Perhitungan Berbasis BIM Pada Pekerjaan Struktur Beton Jembatan. Jurnal Teknik Sipil, 21(2). https://doi.org/10.28932/JTS.V21I2.8560
Tigauw, F. M., Aprilianto, F., & Santoso, H. T. (2023). Analisa Perhitungan Quantity Material Take-Off (QMTO) Struktur Bawah Jembatan Tipe Skew dengan Menggunakan BIM Autodesk Revit. Jurnal Inovasi Konstruksi, 2(2), 58. https://doi.org/10.56911/JIK.V2I2.44
License
Copyright (c) 2026 Mutiara Ramadhanis, Gunawan, Roma Dearni

This work is licensed under a Creative Commons Attribution 4.0 International License.