THE IMPACT OF PROJECT MANAGEMENT AND RISK MANAGEMENT IMPLEMENTATION ON THE PERFORMANCE OF THE IMPLEMENTATION OF UNHABILITABLE HOUSING (RUTILAHU) PROJECTS IN BANDUNG REGENCY

Authors

Idris Syamsir , Didin Kusdian

DOI:

10.5281/zenodo.21862530

Published:

2026-08-09

Downloads

Abstract

The Uninhabitable Housing Program (RUTILAHU) is a government program that requires effective projects and risk management to ensure its implementation meets its stated objectives. This study aims to analyze the influence of project management and risk management on the performance of the RUTILAHU Project in Bandung Regency. The study used a quantitative approach with a survey method. Data were collected through questionnaires distributed to respondents involved in the RUTILAHU Program implementation and analyzed using multiple linear regression. The results indicate that project management and risk management have a positive and significant effect on project implementation performance, both partially and simultaneously. The effective implementation of project management in managing time, cost, quality, and resources, as well as the implementation of risk management through risk identification, analysis, evaluation, and control, can improve project implementation effectiveness. This study concludes that the implementation of project management and risk management are important factors in improving the performance of the RUTILAHU Program. The research findings are expected to provide input for the Bandung Regency Government in improving the effectiveness of the RUTILAHU Program management

Keywords:

Project management Risk management Project performance RUTILAHU Construction projects

References

Al Qordhowi, A. F. Y. (2023). Manajemen Risiko dan Kinerja Proyek Konstruksi: Peran Ketidakpastian Proyek. Jurnal Ilmiah Pendidikan Dasar, 8(01), 123–135.

Baginda, A. B. J., Andi Chairil, F., & Paranoan, S. (2025). The Role of The Human Development Index in Improving The Effectiveness of Social Budget to Achieve Sustainable Development Goals 11. Jurnal Manajemen Bisnis, 12(2), 283–294. https://doi.org/10.33096/jmb.v12i2.1242

Belferik, R., Zulkarnain, I., Samosir, J. M., Afriyadi, H., Rusmiatmoko, D., & Adhicandra, I. (2023). Manajemen Proyek Teori dan Penerapannya. Jambi: PT. Sonpedia Publishing Indonesia.

Diputera, I. G. A., Lestari, I. G. A. A. I., & Utama, I. P. R. A. (2024). Analisis dan Mitigasi Risiko Pembangunan Gedung Mall Pelayanan Publik Kabupaten Gianyar. Jurnal Teknik Gradien, 16(01), 9–17.

Faizal, F., Wibowo, K., & Sulistyo, J. A. (2025). Analisis Kinerja Sistem Manajemen K3 Berbasis ISO 45001 : 2018 pada Pembangunan Jembatan Kaca Sukamahi. Jurnal Kajian Ruang, 5(2), 199–218.

Hanri, M., Dewi, C. E., & Puspita, S. D. (2025). Urgent Choices: Evaluating The Impact of Housing and Wash Programs in Indonesia. Journal of Developing Economies, 10(1), 132–150. https://doi.org/10.20473/jde.v10i1.60247

Kallow, M. A., Bodla, A. A., Ejaz, A., & Ishaq, M. R. (2023). How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), 2779–2787. https://doi.org/10.1080/15623599.2022.2095719

Katani, E. M., & Ng’Olua, T. N. (2025). Impact of Adoption and Application of PMBOK® Guide on Project Performance in Kenya’s Construction Industry: A Multivariate Analysis. Multidisciplinary Journal of Technical University of Mombasa, 4(1), 30–36. https://doi.org/10.48039/mjtum.v4i1.87

Kerzner, H. (2022). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (11th ed.). New Jersey : John Wiley & Sons. www.wiley.com.

Khodabakhshian, A., Puolitaival, T., & Kestle, L. (2023). Deterministic and Probabilistic Risk Management Approaches in Construction Projects: A Systematic Literature Review and Comparative Analysis. Buildings, 13(5), 1–25. https://doi.org/10.3390/buildings13051312

Nugraha, N., & Huraerah, A. (2025). Community Empowerment Through the Implementation of the Social Assistance Program for Unlivable Houses (Rutilahu) for Poor Households in Antapani Kulon Village, Bandung City. Journal of Economic Empowerment Strategy (JEES), 8(2), 91–102. https://doi.org/10.23969/jees.v8i2.31328

Pratiwi, D. A., Sandhyavitri, A., Tri, R., & Iriana, K. (2023). Evaluasi Risiko Keterlambatan Pelaksanaan Konstruksi (Studi Kasus: Proyek Pembangunan Gedung Utama MAKOREM 031/WB Pekanbaru). Jurnal Teknologi Dan Rekayasa Sipil, 2(November), 15–21.

Project Management Institute (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK Guide) -- Seventh Edition and The Standard for Project Management (p. 370). Project Management Institute, Inc.

Stringer, Jusmidah, Fikri, M., & Nurhidayah. (2025). Analisis Persepsi Penerapan Manajemen Proyek Terhadap Keberhasilan Suatu Proyek Konstruksi. Jurnal Ilmiah Ecosystem, 25(1), 185–195.

Sujarwadi, J., Anwar, S., Zaki, M., & Endah, K. (2024). Analisis Faktor Risiko Proyek Konstruksi Jembatan Hidrolik Karangsong-Karangjruju Indramayu. JOURNAL SYNTAX IDEA, 6(08), 3655–3668.

Tambunan, Y. (2024). Manajemen Risiko Dalam Proyek Konstruksi: Evaluasi Dan Pengembangan Model. Jurnal Ekonomi, Akuntansi Dan Manajemen Indonesia, 3(01), 10–19. https://doi.org/10.58471/jeami.v3i01.599

Tandi, Y., Rachman, R., & Tanijaya, J. (2023). Pengaruh Manajemen Proyek Konstruksi terhadap Kinerja Proyek Pembangunan Bronjong Perumahan Nelayan Tahap IV Mansapa Kabupaten Nunukan. Jurnal Konferensi Nasional Teknik Sipil, 01(03), 1–12.

Yuliana, A. (2022). Analisis Penerapan Manajemen Proyek Rekonstruksi pada Ruas Jalan Kwandang - Molingkapoto - Prov. Gorontalo. Jurnal Peradaban SaIns, Rekayasa Dan TeknoLogi, 4(1), 72–78.

Author Biographies

Idris Syamsir, Universitas Sangga Buana YPKP

Author Origin : French Polynesia

Didin Kusdian, Universitas Sangga Buana YPKP

Author Origin : Indonesia

Downloads

Download data is not yet available.

How to Cite

Idris Syamsir, & Didin Kusdian. (2026). THE IMPACT OF PROJECT MANAGEMENT AND RISK MANAGEMENT IMPLEMENTATION ON THE PERFORMANCE OF THE IMPLEMENTATION OF UNHABILITABLE HOUSING (RUTILAHU) PROJECTS IN BANDUNG REGENCY. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(5), 7776–7783. https://doi.org/10.5281/zenodo.21862530

Similar Articles

<< < 23 24 25 26 27 28 29 30 31 32 > >> 

You may also start an advanced similarity search for this article.