Coastal protection construction projects in Jakarta have a high level of complexity due to the influence of hydrodynamic conditions, soft soil, logistical limitations, and social dynamics of coastal communities. These conditions require the role of an effective supervisory consultant to ensure the achievement of project time performance. This study aims to analyze the role of supervisory consultants on time performance in coastal protection construction projects in Jakarta and formulate priorities for delay mitigation actions. The research method uses a quantitative and qualitative descriptive approach with a case study on the Coastal Protection Construction Project in Jakarta Phase 4 Package 1. Primary data were obtained through field observations, interviews, and questionnaires with related parties, while secondary data came from contract documents, progress reports, and project implementation schedules. Data analysis was carried out using the Schedule Performance Variance (SPV) method to measure time performance and the Analytical Hierarchy Process (AHP) to determine the priority of mitigation actions. The results of the study indicate that project delays are influenced by technical, logistical, administrative, and socio-environmental factors. The supervisory consultant plays a significant role in time control through technical, managerial, and administrative supervision. The AHP results indicate that accelerating material delivery and improving piling methods on soft soil are the main priorities in improving project time performance. This study confirms that optimizing the role of supervisory consultants can increase the effectiveness of time control in coastal protection construction projects in coastal areas.

Keywords:

Supervisory Consultant Time Performance Coastal Protection Project AHP SPV

References

Badan Informasi Geospasial (BIG). (2022). Laporan Penurunan Muka Tanah Wilayah Pesisir Jakarta. Jakarta.

Boy, W., Erlindo, R., & Fitrah, R. A. (2021). Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Gedung Kuliah Pada Masa Pandemi Covid 19. Jurnal RIVET (Riset dan Invensi Teknologi), Vol.01 No.01.

Dean, R. G., & Dalrymple, R. A. (2004). Coastal Processes with Engineering Applications. Cambridge: Cambridge University Press.

Dwiretnani, A., Dony, W., Manalu, F.A. (2024). Analisis Kinerja Konsultan Pengawas Dalam Pelaksanaan Proyek Konstruksi. Jurnal Civronlit Unbari, Vol 9 (1), pp. 1-12

Ervianto, W. I. (2020). Manajemen Proyek Konstruksi. Yogyakarta: Andi.

Fahlepi, M.R. (2024). Peran Konsultan Pengawas Dalam Mengantisipasi Kegagalan Pekerjaan Pada Proyek Pembangunan pengaman pantai kritis kabupaten Bengkulu Utara. Profesi thesis, Universitas Andalas.

Kerzner, H. (2018). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. New York: Wiley.

Komar, P. D. (1998). Beach Processes and Sedimentation. New Jersey: Prentice Hall.

Kamaludin Syarifudin, T A M. Tilaar, Fahira F, 2017. Analisis Faktor Yang Mempengaruhi Kinerja Pengawas Lapangan Pada Pelaksanaan Proyek Peningkatan Jalan di Kabupaten Morowali Utara.

Peter F. Kaming, Andrio G. Riano, 2013. Faktor Penentu Kinerja Efektif Bagi Konsultan Manajemen Proyek. Jurnal Teknik Staf Edukasi. Program Studi Teknik Sipil Universitas Atma Jaya Yogyakarta.

Putra, I. K. A. A., Pagehgiri, J., & Ariyanta, I. P. G. (2021). Analisis Kinerja Konsultan Pengawas Konstruksi Dalam Pelaksanaan Proyek Gedung Puskesmas Di Kabupaten Tabanan. Kanjut Kanjut, 13(1), 48-60. https://doi.org/10.47329/teknikgradien.v13i1.741

S. O. Ogunlana, K. Promkuntong and V. Jearkjirm, 1996. “Construction Delays in a Fast Growing Economy: Comparing Thailand with Other Economies,” International Journal of Project Management, Vol. 14, No. 1, pp. 37-45; doi:10.1016/0263-7863(95)00052-6

Soeharto, Iman “Manajemen Proyek : Dari konseptual Sampai Operasional”. Penerbit Erlangga, Jakarta, 2001-jilid 2

Sutrisno, E.. 2016. Manajemen Sumber Daya Manusia. Jakarta: Prenadamedia Group

Tomigolung, F., Sumajouw, M.D.J., & Tarore, H. 2013. “Analisis Kinerja Konsultan Pengawas Pada Proyek Jalan dan Jembatan di Sulawesi Utara. Jurnal Ilmiah Media Engineering, Vol 3 (2), pp. 79-83.

Author Biographies

Tidaryo Kusumo, Universitas Trisakti

Author Origin : Indonesia

Endah Kurniyaningrum, Universitas Trisakti

Author Origin : Indonesia

Downloads

Download data is not yet available.

How to Cite

Tidaryo Kusumo, & Endah Kurniyaningrum. (2026). THE ROLE OF SUPERVISION CONSULTANTS IN TIME PERFORMANCE OF COASTAL PROTECTION CONSTRUCTION PROJECTS IN JAKARTA. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(2), 2512–2519. https://doi.org/10.54443/morfai.v6i2.5013

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.