The Greater Sunrise gas field, with a production capacity of 750 MMSCFD, is a strategic energy source for Timor-Leste. Its development is planned through an offshore refining facility and a 250 km pipeline to Natarbora, requiring comprehensive technical and economic studies. Technically, gas purification is carried out to remove CO₂, H₂S, heavy hydrocarbons, and water vapor to prevent corrosion, hydrate formation, and equipment damage during transportation. The processes used include a three-phase separator, acid gas separation (Acid Gas Removal Unit, AGRU), heavy hydrocarbon separation (Dew Point Control Unit, DPCU), and a water separation unit. Simulation results show that the gas is dominated by 85.1% methane, with the AGRU able to reduce CO₂ from 0.05 to 0.02, resulting in a marketable gas of 724.4 MMSCFD. At the DPCU with a flow rate of approximately 723 MMSCFD, it produces 11 barrels/day of condensate, and the dehydration process produces 723 MMSCFD of dry gas. Economically, a 24-inch diameter pipe was chosen as the most optimal option with a compressor requirement of 5 units. The total CAPEX of the project is 3,337 million USD with OPEX of 51 million USD, including the cost of the pipe, vessel installation, compressor, platform, and gas purification facilities. Based on the results of the gas price sensitivity calculation of 4-10 USD/MMBTU, the project is not feasible at a price of 4-5 USD/MMBTU, which is indicated by a negative NPV, IRR of 2-9%, and a Payback Period of 10-17 years. The project begins to be feasible at a price of 6 USD/MMBTU with an NPV of 1040 million USD, an IRR of 16%, and a Payback Period of 4 years. Furthermore, at a price of 7-10 USD/MMBTU, economic performance improves significantly, with an NPV of up to 6102 million USD, an IRR of up to 47%, and a shorter payback period of 1-3 years. At a gas price of around 7 USD/MMBTU, the project is declared economically feasible and prospective.

Keywords:

Greater Sunrise Compressor Natural Gas Purification Gas Pipeline

References

Daftar pustaka

Adhim, M. D. K., & Nirmala, G. S. (2025). Pemurnian Pelarut MDEA dari Hydrocarbon Terikut Menggunakan Portable Carbon Active Filter pada Unit Acid Gas Removal Unit. Jurnal Nasional Pengelolaan Energi MigasZoom, 7(2), 95-102.

Ahamad, M. A., Rahman, H. A., & Osman, S. (2022, 2022-11-30). Pipeline Wall Thickness Assessment of Various Material Grades and Water Depths Using American and Norwegian Standards. Jurnal Kejuruteraan. https://doi.org/10.17576/jkukm-2022-34(6)-14

Alibaba. (2026a). Berat Hidrokarbon Penghapusan untuk Gas Alam Pemurnian Gas Alam Gas Alam Peralatan Pengolahan. https://www.alibaba.com/product-detail/Heavy-Hydrocarbon-RemovalforNaturalGas_62130024477.html?spm=a2700.prosearch.normal_offer.3.76ab67af8z9zoM&priceId=879d625378cb468f9d392a55ae227041

Alibaba. (2026b). Separator Produksi 3 Fase - Peralatan Minyak & Gas Standar API. https://www.alibaba.com/product-detail/3-Phase-Production-Separator-Oil-Gas_60200028785.html?spm=a2700.prosearch.normal_offer.d_title.6f3367af7rXKi7&priceId=9440234e46a743a0938f4654d092a064

Alibaba. (2026c). Unit Dehidrasi Gas Penghilang H2O Dari Gas Alam dan Dehidrasi Saringan Molekuler Gas atau Dehidrasi Molekuler. https://www.alibaba.com/product-detail/Gas-Dehydration-Unit-H2O-Removal-From_1600348189793.html?spm=a2700.prosearch.normal_offer.d_title.bd4467afxcfeH7&priceId=24e8440704bc4447a4f920a49f64ad59

Alibaba. (2026d). Unit Penghilang CO2 Metode MDEA untuk Gas Alam, Peralatan Dekarbonisasi Gas Alam, Pabrik Pemurnian Alami, dan Pabrik LNG. https://www.alibaba.com/product-detail/Natural-Gas-MDEA-Method-CO2-Removal_1600113968321.html?spm

Ardiansyah. (2008). Perancangan Sistim Perpipaan TRansmisi Gas Dari Muara Bekasi Kemuara Tawar Melalui Jalur lepas Pantai AH Saputra, A Ardiansyah - Makara Journal of Technology, 2010 - neliti.com.

Association, G. P. (1998). Engineering Data Book. Gas Processors Suppliers Association. https://books.google.co.id/books?id=JD5QwAEACAAJ

Bahri, S., Oetomo, D. S., & Hermawan, A. (2024, 2024-09-27). Financial Feasibility Analysis of Copper Cathode Factory at PT. X in Central Kalimantan. Sainteks: Jurnal Sain dan Teknik. https://doi.org/10.37577/sainteks.v6i02.778

Batuthoh, M. W. I., Ilyas, K. R., Palupi, B., Putri, D. K., Rahmawati, I., & Rizkiana, M. F. (2024). Prarancangan pabrik liquefied natural gas (lng) dari shale gas dengan kapasitas 400.000 ton/tahun. Jurnal tugas akhir teknik kimia, 7(1), 70-74.

Bontadelli, b. W. G. S. J. A. (1999.). Engineering Economy. https://www.biblio.com/9780130115706

Campbell, J. M. (1992-Volume 2). Gas Conditioning and Processing - The Equipment Modules

Chipade, N. S., & Patil, A. N. (2016). Design & Analysis of Piping System for Optimization of Pipe Wall Thickness. Int J Eng Res & Technol, 5(6).

Copco, A. (2025). Calculate your potential energy savings by optimizing your compressed system https://www.atlascopco.com/en-id/compressors/air-compressor-blog/energy-savings-calculator

Corp, W. I. (1987). Pipe Wall Thickness. https://www.pipefittingweb.com/index.html

Kidnay, A. J., Parrish, W. R., & McCartney, D. G. (2019). Fundamentals of natural gas processing. CRC press.

Michael. (2021). Analisis Teknik Dan Ekonomi Pembangunan Pipa trasmisi Gas Bumi DUMAI -SEI MA

Pandapipe. (2026 ). Hitung Berat Pipa Struktural, Tekanan, Ketebalan Dinding, Panjang. https://pandapipe.com/id/blog/calculate-structural-pipes/

Patrick, M., & French, N. (2016, 2016-10-17). The internal rate of return (IRR): projections, benchmarks and pitfalls. Journal of Property Investment & Finance, 34, 664-669. https://doi.org/10.1108/jpif-07-2016-0059

Pinandito, A. (2021). Penentuan Ukuran Pipa Berdasarkan Laju Alir Maksimum Terjadi Erosi Dengan Persamaan Erosional Flow Pada Pipa Salur Sumur X Lapangan Y.

Rahaman, M. S., Sakib, A., Samad, A., & Islam, M. A. (2025, 2025-05-18). Predicting Gas Well Performance with Decline Curve Analysis: A Case Study on Semutang Gas Field. ArXiv, abs/2505.12333. https://doi.org/10.48550/arxiv.2505.12333

Re, I. (2020). Pipe-Laying Method In Offshore/Subsea Construction. https://www.indonesiare.co.id/id/article/pipe-laying-method-in-offshore-subsea-construction

Scheiner, C. (2021). Timor‐Leste economic survey: The end of petroleum income. Asia & the Pacific Policy Studies, 8(2), 253-279. https://doi.org/10.1002/app5.333

Seggie, R., Ainsworth, R., Johnson, D., Koninx, J., Marshall, N., Murray, A., Phillips, S., Spaargaren, B., & Stephenson, P. (2003, 2003-01-01). The Sunrise-Troubadour Gas-Condensate Fields, Timor Sea, Australasia. 189-209. https://doi.org/10.1306/m78834c11

Seggie, R. J., Ainsworth, R. B., Johnson, D. A., Koninx, J. P. M., Marshall, N. G., Murray, A., Stephenson, P. M., & Phillips, S. E. (2000, 2000). Petroleum Geology of the Sunrise-Troubadour super giant gas condensate field, Timor Sea, Australia.

Steel, T. (2008). Carbon Steel Pipe Price List. https://www.tridentsteel.co.in/carbon-steel-pipe-price-list.html?utm_source

Syukur, M. H. (2023). Analisa Teknis Unjuk Kerja Pipa Transmisi Gas Open Access pada Region IV Area Jawa Timur. Jurnal Nasional Pengelolaan Energi MigasZoom, 2023•ejurnal.ppsdmmigas.esdm.go.id.

Wang, S. (2025, 07/22). Net Present Value (NPV) Vs. Internal Rate of Return (IRR): Evaluating Investment Rules in Financial Markets. Highlights in Business, Economics and Management, 59, 273-282. https://doi.org/10.54097/dk5r9k48

Wibowo, Y. E. W., Jaka. (2022). Kondisi gas bumi Indonesia dan energi alternatif pengganti gas bumi. Jurnal Energi Baru dan Terbarukan, 3(1), 1-14.

Author Biography

Francisco Manuel Gusmao, Universitas Indonesia

Author Origin : Timor-Leste

Downloads

Download data is not yet available.

How to Cite

Manuel Gusmao, F., & Kartohardjono, S. (2026). TECHNO-ECONOMIC ANALYSIS OF THE NATURAL GAS PIPELINE CONSTRUCTION AND REFINING PROCESS FROM GREATER SUNRISE OFFSHORE TO NATARBORA ONSHORE, TIMOR-LESTE. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(4), 5596–5610. Retrieved from https://radjapublika.com/index.php/MORFAI/article/view/5565

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.