PROJECT MANAGEMENT PERFORMANCE ANALYSIS FOR IMPROVING ROAD CONSTRUCTION IMPLEMENTATION KARAWANG CIKAMPEK PAMANUKAN

Authors

Tiki Rysianne , Abdul Chalid

DOI:

10.5281/zenodo.21457381

Published:

2026-07-20

Downloads

Abstract

This study aims to determine and analyze the influence of planning, organizing, implementing, and supervising the performance of the Karawang-Cikampek-Pamanukan road construction project , both partially and simultaneously . The research method used in this study is a quantitative research method. This study was conducted on the Karawang-Cikampek-Pamanukan road construction improvement project by collecting data using a questionnaire , the sample used was 45 respondents. The data source in this study is primary data with multiple linear regression analysis and hypothesis testing, with data processing using SPSS software version 26. The results of the study indicate that planning has a positive and significant effect on the performance of the Karawang-Cikampek-Pamanukan road construction improvement project . Organizing has a positive and significant effect on the performance of the Karawang-Cikampek-Pamanukan road construction improvement project . Implementation has a positive and significant effect on the performance of the Karawang-Cikampek-Pamanukan road construction improvement project . Supervision has a positive and significant effect on the performance of the Karawang-Cikampek-Pamanukan road construction improvement project . Project management consisting of planning, organizing, implementing, and supervising has a significant influence on the performance of the Karawang–Cikampek–Pamanukan Road construction improvement project .

 

Keywords:

Management Project Road Construction and Performance

References

Ahmad, F. S. (2022). Dampak Pembangunan Jalan Tol Trans Jawa terhadap Pertumbuhan Ekonomi di Jawa Tengah The Impact of Trans Java Toll Road Construction on Economic Growth in Central Java. 11(1), 1–18.

Ghozali, I. (2021). Aplikasi Analisis Multivariete Dengan Program IBM SPSS 23. Semarang: Badan Penerbit Universitas Diponegoro.

Hussain, S. B., Khaja, M., Uddin, M., Mohammed, S., Uddin, S., & Ali, F. (2022). The Impact of Project Management Practices on Project Success. International Research Journal of Engineering and Technology (IRJET), 09(05), 995–1002.

Islah, M., Hanantatur, A., Wahyudi, Jabsyam, A., Rantisi, Zahara, A. Della, & Janna, M. (2024). Evaluasi Efektivitas Penerapan Konsep Manajemen Proyek PadaPelaksanaan Proyek PelebaranJalan Menambah Lajur Batas Kabupaten Kampar-Batas Kota Bangkinang. Ensiklopedia Research and Community Service Review, 4(1), 83–90.

Junjunan, D., Rachmat, A., & Sugiri, T. (2022). Pengaruh Budaya K3, Komitmen Pimpinan Perusahaan dan Kompetensi Karyawan Perusahaan terhadap Kinerja Proyek Konstruksi (Studi Kasus Proyek Rehabilitasi Jalan di UPTD Pengelolaan Jalan dan Jembatan Wilayah Pelayanan IV). Jurnal Techno-Socio Ekonomika, 15(1), 9–23.

Kurniawan, F. T., Soekirman, A., Gautama, I., Ricardianto, P., Studi, P., Transportasi, M., Manajemen, F., & Trisakti, I. T. L. (2024). Pengaruh Pengelolaan Biaya Logistik dan Infrastruktur Transportasi terhadap Kinerja Logistik Nasional Indonesia. Jurnal Penelitian Transportasi Darat, 26(2), 75–88.

Paharuddin, Nadir, M., & Anshari, A. I. (2024). Manajemen Proyek (A. Asari & A. Febriyanti (eds.); Cetakan Pe). PT Mafy Media Literasi Indonesia.

Pratiwi, S., Abduh, M. N., & Yunus, A. Y. (2026). Studi Penerapan Manajemen Konstruksi Pada Proyek Pembangunan Jalan Akses Tol Makassar New Port. Jurnal Penelitian Teknik Sipil Konsolidasi, 4(1), 214–223.

Putri, F. H. (2026). Manajemen Proyek Pembangunan Infrastruktur dalam Meningkatkan Efektivitas Pelaksanaan Proyek. Catha : Journal of Creative and Innovative Research, 3(1), 3046–8760.

Riyanto, S., & Hatmawan, A. A. (2020). Metode Riset Penelitian Kuantitatif : Penelitian di Bidang Manajemen, Teknik, Pendidikan dan Eksperimen. Sleman : CV. Budi Utama.

Rochmawati, R., Mabui, D. S. ., & Irianto. (2024). Penerapan Aspek Manajemen Proyek pada Pembangunan Jalan Trans Papua Wamena–Jayapura. Teknik Sipil Seminar Nasional, 01(03), 440–448.

Sadad, I., & Sangidana, G. A. (2024). Analisis Pengaruh Manajemen Konstruksi dalam Penanganan Keterlambatan pada Proyek Konstruksi. Teknika Sains: Jurnal Ilmu Teknik, 9(1), 76–84.

Safari, A., Solikin, M., Sunarjono, S., Handayani, F. S., & Harnaeni, S. R. (2021). Identifikasi indikator kinerja untuk mengukur keberhasilan pada proyek konstruksi jalan beton berdasarkan perspektif penyedia jasa konstruksi. Wahana TEKNIK SIPIL, 29(1), 51–65.

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 233–239.

Stringer, Jusmidah, Fikri, M., & Nurhidayah. (2025). Analisis Persepsi Penerapan Manajemen Proyek Terhadap Keberhasilan Suatu Proyek Konstruksi. Jurnal Ilmiah Ecosystem, 25(1), 185–195.

Sugiyono. (2023). Metode Penelitian Kuantitatif, Kualitatif, dan R&D (Sutopo (ed.); Edisi 5). Bandung : Alfabeta.

Tumilantouw, H., & Brilia. (2024). Penerapan Sistem Manajemen Konstruksi Pada Pekerjaan Kontruksi. Tekno, 22(89), 9457–9469.

Yuliana, A. (2022). Analisis Penerapan Manajemen Proyek Rekonstruksi pada Ruas Jalan Kwandang - Molingkapoto - Prov. Gorontalo. Jurnal Peradaban SaIns, Rekayasa Dan TeknoLogi, 4(1), 72–78.

Author Biographies

Tiki Rysianne, Universitas Sangga Buana YPKP

Author Origin : Indonesia

Abdul Chalid, Universitas Sangga Buana YPKP

Author Origin : Indonesia

Downloads

Download data is not yet available.

How to Cite

Tiki Rysianne, & Abdul Chalid. (2026). PROJECT MANAGEMENT PERFORMANCE ANALYSIS FOR IMPROVING ROAD CONSTRUCTION IMPLEMENTATION KARAWANG CIKAMPEK PAMANUKAN. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(5), 7164–7177. https://doi.org/10.5281/zenodo.21457381

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.