IMPROVING PROJECT PERFORMANCE THROUGH RISK COMMUNICATION AND RISK CONTROL IN BRIDGE CONSTRUCTION KLARI WATERFALL, KARAWANG

Authors

Agung Satrio Utomo , Abdul Chalid

DOI:

10.5281/zenodo.21627876

Published:

2026-07-27

Downloads

Abstract

The success of a construction project is greatly influenced by the ability to manage risks effectively, particularly through risk communication and risk control. This study aims to analyze the influence of risk communication and risk control on project performance in the Curug Klari Bridge construction project in Karawang. The study used a quantitative approach with a survey method. Data were obtained through questionnaires distributed to parties involved in the project implementation and analyzed using multiple linear regression with the help of IBM SPSS Statistics version 26. The results indicate that risk communication has a positive and significant effect on project performance. Risk control also has a positive and significant effect on project performance. Furthermore, risk communication and risk control simultaneously have a positive and significant effect on project performance. These findings indicate that effective risk communication and consistent risk control can improve coordination, support decision-making, minimize the impact of risks, and encourage the achievement of project objectives. Therefore, the implementation of risk communication and risk control needs to be an integrated part of project management to improve construction project performance.

Keywords:

Risk Communication Risk Control Project Performance Risk Management Construction Project.

References

Almutahir, & Wiguna, I. P. A. (2024). Analysis of Barrier and Driver Factors to Risk Monitoring and Control Implementation in Construction Projects. Jurnal Indonesia Sosial Teknologi, 5(5), 2130–2141. https://doi.org/10.59141/jist.v5i5.1077

Atasoy, G., Ertaymaz, U., Dikmen, I., & Talat Birgonul, M. (2022). Empowering Risk Communication: Use of Visualizations to Describe Project Risks. Journal of Construction Engineering and Management, 148(5).

Chrisanty, T. W., & Tambotoh, J. (2024). Analisis manajemen risiko sistem informasi menggunakan metode NIST SP 800-30. Jurnal Sistem Informasi, 5(2), 372–381.

Hardiputra, A., Noviaristanti, S., & Rahadian, D. (2025). Project Risk Mitigation in Construction Projects (Case Study of Medan Station Building and Emplacement Development Project Phase II). Jurnal Manajemen Indonesia, 25(1), 1–13.

Hartono, W., Handayani, D., & Ahya, B. A. (2024). Analisis Manajemen Risiko Kecelakaan Kerja Dengan Standar As/Nzs 4360:2004 Pada Proyek Konstruksi Jembatan Beton. Matriks Teknik Sipil, 11(4), 391.

Hudoyo, C. P., & Purwono, N. A. S. (2023). Tindakan Preventif dan Korektif Sebagai Pengendalian Risiko Kinerja Biaya pada Proyek Konstruksi Pelabuhan. Briliant: Jurnal Riset Dan Konseptual, 8(2), 455.

Johari, G. J., & Fazriani, R. R. (2022). Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi Bangunan Gedung di Kabupaten Garut. Jurnal Konstruksi, 19(2), 330–339. https://doi.org/10.33364/konstruksi/v.19-2.923

Kallow, M. A., Bodla, A. A., Ejaz, A., & Ishaq, M. R. (2023). How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), 2779–2787.

Lestari, I. G. A. A. I. K. K., & Pratiwi, N. K. K. (2023). Mitigasi Risiko Proyek Pembangunan Gedung Pelayanan Kesehatan Ibu dan Anak. Jurnal Ilmiah Kurva Teknik, 12(2), 153–157.

Mael, T. M., Hadi, A. K., & Marica, H. (2025). Pengaruh penerapan Keselamatan dan Kesehatan Kerja (K3) terhadap kinerja pada proyek pembangunan Gedung Laboratorium Terpadu Kemaritiman Universitas Negeri Gorontalo (UNG). Jurnal Teknik Industri Terintegrasi, 8(1), 1422–1432.

Muafiq, R., Putra, I. N. D. P., & Rumintang, A. (2021). Pengaruh Budaya Keselamatan dan Kesehatan Kerja ( K3 ) Terhadap Kinerja Proyek Konstruksi. Jurnal Teknik Sipil Universitas Teuku Umar, 7(1), 27–39.

Novianto, D., Nugroho, A., & Samadikun, B. P. (2023). Identifikasi dan Analisis Manajemen Risiko pada Pekerjaan High Rise Building Studi Kasus: Proyek Pembangunan Gedung Penunjang Siaran dan Studio Luar Negeri. Jpii, 1(7), 292–299. https://doi.org/10.14710/jpii.2023.23855

Nugroho, H. P., & Purwanto, E. (2024). Kesehatan Kerja Pada Proyek Pembangungan Jembatan Berdasarkan Iso 31000 : 2018. Jurnal Sains Student Research, 2(5), 194–206.

Pagoray, G. L. (2022). Kesehatan dan Keselamatan Kerja (K3) merupakan upaya kita untuk menciptakan lingkungan kerja yang sehat dan aman, sehingga dapat mengurangi probabilitas kecelakaan kerja /penyakit akibat kelalaian yang mengakibatkan demotivasi dan dan defisiensi produktiv. Jurnal Ilmiah Ecosystem, 22(1), 108–119.

Peli, M., Utama, W. P., Jumas, D. Y., Zulherman, Z., Sesmiwati, S., Ariani, V., Roza, F., & Thaha, P. (2022). Faktor Determinasi Komunikasi Efektif Di Proyek Konstruksi Dari Perspektif Multiple Stakeholders. Jurnal Studi Komunikasi Dan Media, 26(2), 109–122.

Prasasto, A. R., & Putra, I. N. D. P. (2024). Risiko pada Proyek Konstruksi Gedung Bertingkat. Jurnal Ilmiah Keagamaan Dan Kemasyarakatan, 18(5), 3812–3831.

Ramadhan, M. B., Utoyo, S., Setiono, J., Manajemen, M., Konstruksi, R., Sipil, J. T., Malang, P. N., Jurusan, D., & Sipil, T. (2023). Analisis Manajemen Risiko Konstruksi Proyek Pembangunan Hotel Santika Wonosari D.I. Yogyakarta. JOS-MRK, 4(1), 259–266. http://jos-mrk.polinema.ac.id/

Safari, A., Solikin, M., Sunarjono, S., Handayani, F. S., & Harnaeni, S. R. (2021). Identifikasi indikator kinerja untuk mengukur keberhasilan pada proyek konstruksi jalan beton berdasarkan perspektif penyedia jasa konstruksi. Wahana TEKNIK SIPIL, 29(1), 51–65.

Septianugraha, A. F., Nugraheni, F., & Astuti, S. A. Y. (2024). Analisis Manajemen Risiko Konstruksi Pada Proyek Konstruksi Bendungan Berdasarkan Konsep ISO 31000 : 2018. AGREGATE, 9(2), 1083–1090.

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 233–239.

Simanjuntak, I. J., Siagian, R. T., Prasetyo, R., Rozak, N. F., & Hardi, H. P. (2022). Manajemen Risiko Pada Proyek Konstruksi Jembatan : Kajian Literatur Sistematis. Jurnal Teknologi Dan Manajemen, 20(2021), 59–76.

Song, J., Munyinda, M., & Adu Sarfo, P. (2025). Examining the impact of risk management practices on sustainable project performance in the construction industry: the role of stakeholder engagement. Frontiers in Built Environment, 11(May), 1–15.

Sundara, D. M., Tiorivaldi, & Sodri, A. (2024). Optimalisasi Kinerja Proyek Konstruksi Bangunan Gedung melalui Building Information Modelling. Jurnal Rekayasa Insfrastruktur, 10(2), 66–74.

Author Biographies

Agung Satrio Utomo, Universitas Sangga Buana YPKP

Author Origin : Indonesia

Abdul Chalid, Universitas Sangga Buana YPKP

Author Origin : Indonesia

Downloads

Download data is not yet available.

How to Cite

Agung Satrio Utomo, & Abdul Chalid. (2026). IMPROVING PROJECT PERFORMANCE THROUGH RISK COMMUNICATION AND RISK CONTROL IN BRIDGE CONSTRUCTION KLARI WATERFALL, KARAWANG. Multidiciplinary Output Research For Actual and International Issue (MORFAI), 6(5), 7582–7590. https://doi.org/10.5281/zenodo.21627876

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.