PROJECT MANAGEMENT ANALYSIS OF COMMUNITY BASED SANITATION ACTIVITIES IN LANGKAT REGENCY
DOI:
10.54443/ijerlas.v5i4.3877Downloads
Abstract
This study analyzes project management practices and proposes strategic recommendations to minimize time addendums in the implementation of the Community-Based Sanitation (Sanimas) activities in Langkat Regency. Sanimas, initiated by the Ministry of Public Works and Housing, aims to expand access to proper sanitation through community participation. Despite its achievements, the program has faced execution challenges, particularly related to time constraints under the self-managed construction model. The research employs the Critical Path Method (CPM) to identify key activities affecting project duration. Findings indicate that delays in procurement and construction stages significantly contributed to the extension of project timelines beyond the stipulated 90 days. The total project duration based on the CPM analysis was found to be 47 days for critical path activities. This study recommends strengthening the capacity of Community-Based Implementation Team, enhancing coordination with stakeholders, integrating risk-based scheduling, and institutionalizing post-project evaluations. These strategic improvements are essential for ensuring timely and efficient implementation of future Sanimas projects.
Keywords:
Sanimas, Project Management, Critical Path MethodReferences
Fadila, N., Putri, R. A., & Santoso, D. 2024. Efisiensi Waktu sebagai Indikator Keberhasilan Proyek Sanitasi. Jurnal Teknik Sipil dan Lingkungan, 8(1), 22–30.
Fazis, M., & Tugiah. 2022. Perencanaan Proyek dan Penjadwalan Proyek. Jurnal Sosial dan Teknologi, 2(12), 1365-1370.
Kementerian PUPR. 2024. Petunjuk Teknis Pelaksanaan Kegiatan Sanitasi Berbasis Masyarakat T.A. 2024. Jakarta: Kementerian PUPR.
Nasution, A. K., Siregar, B., & Lubis, M. 2022. Manajemen Risiko pada Proyek Sanitasi di Sumatera Utara. Jurnal Manajemen Risiko Infrastruktur, 4(1), 15–27.
Natalia, A., & Maulidya, E. N. 2023. Aktualisasi Empat Pilar Sustainable Development Goals (SDGs) di Perdesaan Kecamatan Natar Kabupaten Lampung Selatan. Jurnal Ilmiah Ilmu Pemerintahan (JIIP), 8(1).
Project Management Institute. 2017. A guide to the project management body of knowledge (PMBOK® Guide) (6th ed.). Pennsylvania: Project Management Institute.
Ramdhan. (2020). Analisis Faktor Penyebab Terjadinya Keterlambatan pada Proyek Konstruksi. Jurnal Ilmiah Media Engineering, 6(2), 45–52.
Willetts, J., Mills, F., & Al’Afghani, M. 2020. Sustaining Community-Scale Sanitation Services: Co-management by Local Government and Low-Income Communities in Indonesia. Frontiers in Environmental Science, 8, 98. https://doi.org/10.3389/fenvs.2020.00098.
License
Copyright (c) 2025 Abdilah Ragilia M, Wahyu Ario Pratomo, Rulianda Purnomo Wibowo

This work is licensed under a Creative Commons Attribution 4.0 International License.